more about belt conveyor

Showing posts with label roller. Show all posts
Showing posts with label roller. Show all posts

Thursday, December 17, 2015

How to Solve the Problem of deviation of belt conveyor

Belt deviation of belt conveyor is the most common troubles in operation. Key points to solve the problem are ensuring the precious size in installation and regular maintenance. As various reasons of deviation, we need to solve problems distinctively.

1. Adjust carrying idler group. When belt in middle section is deviation, can adjust the place of carrying idler group. The concrete way is that forward idler group to the side belt biased while other side backward. Move the lower part of idler left when belt running deviation upward when upper part downward.

fixed-belt-conveyor

2. Install spherical idler group. There are many types of spherical idler, such as intermediate shaft type, four link type, vertical roller type, etc. It is reasonable to install spherical idler for shorter belt or two-way running belt conveyor because shorter belt conveyor is easy deviation and uneasy to adjust. However, longer belt conveyor may as well not use this way as spherical idler may effect the service life of belt.
belt-sway-switch

3. Adjust the positions of driving roller and bend roller. If belt is running deviation to the right side of driving roller, move bearing at right side forward. And same to the left side. Adjustment method of bend roller is opposite with driving roller. Adjust repeatedly to the ideal position and may well as install accurately before adjust the rollers.

Belt Conveyor

4. Adjust take-up unit. Take-up unit adjustment is the very important part of deviation adjustment of belt conveyor. Two bend rollers at the upper side of heavy hammer take-up should perpendicular to belt length direction and vertical gravity to ensure its shaft center line horizontal. When use screw take-up or hydrocylinder take-up, two bearings of take-up roller should translate at the same time to ensure roller axis is vertical with longitudinal direction of belt conveyor.

Tuesday, November 17, 2015

The Daily, Weekly, Monthly Belt Conveyor Check

When using the belt conveyor, less daily check and maintenance or do not pay attention to maintenance will greatly reduce the service life of the belt conveyor, when the belt conveyor problems occur, it will affect the work efficiency, so regular inspection for belt conveyor parts is needed.
Daily check
Mechanical items: inspect the guardrail, bridge, roller, pulley, turnabout pulley and belt.
Electrical items: inspect the anti-skid device, deviation switch, emergency stop switch, tear detection device, anti-reverse device.
pull switch

Weekly check
Mechanical items: inspect the driving wheel, guide wheel section, reducer, inspect the machine's tail, check tensioning device and pull rope device.
Electrical items: inspect the main motor, inverter, filter, repair and inspect the main transformer wiring, electrical control, power system.
Monthly check
Mechanical items: inspect the rope wheel, transition wheel, guide wheel, driving wheel, belt wheel, tensioning car and check the oiling.
Electrical items: inspect the fastening bolts, fast switch; the maintenance and repair of commutator, limit protection, emergency stop protection and the alarm system. 

 belt slip detector

Thursday, October 29, 2015

Keep Attention the Safety Installation of Coal Mine Belt Conveyor

Keep Attention the Safety Installation of Coal Mine Belt Conveyor

In order to ensure the safety of the operator,it is better to keep the correct installation method in the process of coal mine belt conveyor.Here PK Machinery would like to introduce the measures according to the following aspects.
1.Overall installation standards
   When installing the belt should be:
   ①In accordance with the given production midline, belt should lay flat
   ②Guarantee the upper and lower rollers complete and effective
   ③Make sure sweeper is installed in line with the provisions
   ④Ensure the head closure plate, tail fence is complete and reliable
2.Belt Parts Installation:Components are installed in accordance with the tail, the middle frame, the nose, the order of the belt to transport and put.When the belt is installed to meet the requirements, fixed each connection bolts
3.Belt conveyor is installed in accordance with the head, the middle frame, tail, belt,each roller and belt center line should be put into a straight line
4. Sweeper Installation: When installing, Sweepers require good surface contact with the conveyor belt, while ensuring the nose and tail have a sweeper
5.All the installation is complete and ensure that all rollers in contact with the tape in good condition after, began to test.

coal-conveyor-belt
PK Machinery has been exporting belt conveyor, bucket elevator, scraper conveyor, screw conveyor, vibrating screen and other spare parts for many years. We do believe business between our customers and us can develop fast. Any enquiry, please contact us!
Tel:+863735799198
Fax:+863735071699

Wednesday, October 21, 2015

What Should You Pay Attention to About the Conveyor Belt with Large Angle?


Why you should pay attention to the belt conveyor with large angle? That almost because the heavily damaged by the belt which is under the overload.And then,this damaged will not only lead to the belt reversal,but cause more seriously accidient like belt broken,frame destroy.In order to avoid more damaged by the conveyor belt with large dip angle,it is necessary to learn the anti-reversal control methods.The following introduction would like to introduce the analysis detailedly.

Are you still using the capture device method to avoid this destory by the overload?You may find that it doesn't have a better real effect.Today we will show you a fresh way which you should pay attention so much.
With the anti-reversal control method,it’s better for you to adopt unidirectional rollers.
1.     When the belt goes up, the rollers will rotate accordingly
in this case, friction between upper belt and rollers is rolling friction.
2.     When the belt is breakage and upper belt goes downward slide, the rollers will not do reverse rotation
on this occasion, friction between upper belt and rollers is sliding friction. 
And then,in this way can it realize breaking.

-------------------------------------------------------------------------
Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyorVibrating screenBucket elevatorScrew conveyorand Scraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. our goal is "be the future global leader of mining machinery industry". have any questions, please contact us without any hesitation.

Henan Pingyuan Mining Machinery Co., Ltd 
Address: 289 Yellow River Road, Xinxiang City, Henan Province, China. 
Tel: +86 373 579 9198
Fax: +86 373 507 1699
Email Address: info@pkmachinery.com
Official Website: http://www.pkmachinery.com/


Friday, September 4, 2015

What are the Components of Belt Conveyor

1. Conveyor frame parts
Including: head frame, tail frame, intermediate frame and supporting leg which are produced by cutting, welding, punching and polishing with standard channel, angle iron, steel and other.
2. Composition of other components:
i. Roller
Roller has the highest quantity and is the most carrying parts of belt conveyor. Impact roller, friction centering carrier roller, belt conveyor roller, and so on are included. The lifespan of roller is depends on the usage, usually the roller needs to be replaced every one to two years.

belt conveyor rollers
 
ii. Drum pulley 
Power conversion device and redirection device of belt conveyor including the drive pulley and return pulley. It is durable but the bearings need to be lubricated.

belt conveyor pulley manufacturer
 
iii. Conveyor belt
It is one of the most expensive parts of belt conveyor, and also an important part to carry the materials. Hence, it needs to be maintained properly.
iv. Driving device
It is the power source of belt conveyor. Commonly motor works together with reducer, however, motorized pulley can also be used. 
3. Cleaning device
Including : head cleanser, non-loaded cleanser, tail cleanser, spring cleanser and so on.

belt conveyor cleaning device
 
4. Protection device
Including : pull-cord switch, running deviation switch, skid detector and so on.

pull switch of belt conveyor
 
5. Electronic control device: 
Including: electric cabinet, power protection device.
All the parts mentioned above are needed to ensure the normal operation ad production of belt conveyor, hope this article is helpful!

 belt conveyor delivery

Monday, August 31, 2015

What Should We Note During the Installation of Large Angle Belt Conveyor

Large angle belt conveyor can be transported with large inclination , it even can be vertical. It adopts sidewall belt as the main part. The advantages are: large conveying amount, small space occupation ,small noise etc. which is widely used for conveying powder, blocked material. Here PK Machinery will introduce the installation notes during installation:
1.Check whether the components of large angle belt conveyor are complete or not
Generally speaking, belt conveyor includes lots of components: head & tail frame, concave & convex segmental arc frame and middle frame, however, the quantity of trough roller frame, rollers and sealing cover is big, you need to check carefully and guarantee the components are transported to the right place.
2.Installation, positioning and welding of head and tail frame, concave and convex segmental arc frame
First of all, please find the center line of the belt conveyor by using a steel wire. When installation, please make the head & tail frame, concave & convex segmental arc frame subject to the center line.

convex segmental arc frame
 
3.Check belt running and adjust the belt if it runs off tracking
After installation of belt, trough roller, self-aligning roller and vertical roller, connect the power supply , run the belt and adjust the belt offset distance .
4.Installation of large dip Angle belt conveyor accessories and bolts
After adjusting the belt, you can start to install the sealing cover, head cover and fastening bolts.

Angle belt conveyor design